ACUA’s Egg Harbor City Pump Station has undergone a major overhaul. The pump station conveys more than 117 million gallons of wastewater a year from Egg Harbor City to ACUA’s treatment plant in Atlantic City for further treatment. The station received new pumps, a new prefabricated building to hold the pumps, electrical work, and overall site improvements.
The station was built in 1991 when Egg Harbor City joined ACUA’s regional wastewater treatment system. At the time, it was standard to place the pumps that are used to move the wastewater in dry well cans located 25 ft. underground.
Over the years, this layout made repairs on the pumps inefficient and increasingly costly. It required that pumps be dissembled then sent away for maintenance, which could exceed $300,000 each time.
Rather than constructing a new building to house the pumps above ground, ACUA’s Centralized Maintenance and Systems teams explored a prefabricated solution. This cost-effective method allowed the building to be constructed offsite and later installed at the Chicago Avenue location.
To move forward with the project, a temporary pump was installed to handle the incoming wastewater flow as work was completed. Excavation was performed in-house, and once the building was in place, ACUA’s Centralized Maintenance, Systems and Facilities teams installed the new pumps as well as the pipes and electrical components to connect the new pumps to the system.
This proactive $500,000 investment, completed primarily in-house by skilled ACUA employees, will significantly decrease maintenance costs moving forward and increase the system’s resiliency.